Techniques of procedures valuation to get good reporting

Techniques of reporting procedures of valuation

Collecting Data 

Manager 
Accept Contract or instructions that have been approved with the client, and has been through the process of evaluating the assignment in accordance with the Quality Control SOP assignment. 
Define scope of work and the property assessed. 
Evaluate the assignment in accordance with the Quality Control SOP assignment. Based on the results of the evaluation, set the team work for inspection and evaluation of the assessment. 
Make sure that the available documents and related assets is complete. If not complete, follow up to the Client. 
Create a letter for the Task assessors, and provide instruction in accordance with the scope and object of the work assessed. 

Estimator 
Receive Letters from Task Manager. 
Make a field visit (visit site). 
Make a note on the data field based on the Working Paper and the related assets. 
Perform the verification information 
If necessary, ask for data from the source of information or reference. 
Collect benchmark data according to the minimal set SPI. Use of the data, including: interviews, visits, discussions and other approaches that fit with the SPI. 
Special assessments for special properties, assessors must explore the approach of reference and analysis of special properties. 
Make a shooting on the property. 
Make sure the data was in accordance with the provisions of Standard valuation: 
If not, do the following benchmark data 
If appropriate, note on the Paper Work 
Working Paper distribute and document inspection results to the Manager to be evaluated. 

Manager 
Together with assessors/valuer who are appointed, do the preparation of a draft initial assessment report. 
Discuss assessment results with the Director of Engineering. 
Perform verification of data provided by: 
If the data does not match, ask to be re-inspections conducted 
If appropriate data, stack draft assessment report 
Distributed to the Director of Engineering. 

Technical Director 
Do re-examination of reports and data provided. 
Perform verification of data provided by: 
If the data does not match, ask to be re-inspections conducted 
If appropriate data, stack draft assessment report 
Distribute to the Production. 

If the client asks for an indication of the assessment, then that can be given after the assessment is through this stage in the form of a short indication of the assessment report. 

Production 
Perform Rating drafting reports based on the evaluation of the Manager and Quality Control Officer. 
Manager to distribute to be evaluated. 

Manager 
Ensure consistency of data between the previous draft approved by the Rating Reports: 
If it does not fit, return to production to be. 
If appropriate, continue the process. 
Continue the process of finalization. 


Finalization 
Manager 
Working Paper and distribute draft reports to the Director of Engineering. 

Technical Director 
Evaluation of consistency between Paper and draft reports. 
If the data on the Working Paper and the draft report does not return to production according to the revision draft reports. 
If the data on the Working Paper and the draft reports have been appropriate, continue the process. 
Give approval to the draft inspection report as evidence. Distribute to the Production Report for the Final. 

Production 
Create a Final Report based on the evaluation and review of draft reports. 
Manager to distribute. 

Manager 
Evaluation of the draft reports and final reports. 
If it does not fit, return to production to be revised. 
If appropriate, give approval initials. 
Distribute to the Quality Control Officer. 

Quality Control Officer 
Evaluation of the draft reports and final reports. 
If it does not fit, return to production to be revised. 
If appropriate, give approval initials. 
Distributed to the Director. 

Director 
Evaluation of the draft reports and final reports. 
If it does not fit, return to production to be revised. 
If appropriate, give approval signature. 
Distribute to the production process for the delivery or handover to the client. 

Production 

Make Final report to the Client. 
Ensure the Client has signed the Receipt Report. 
After receiving the Receipt Reports, together with documentation on file from the client's work.

Sunday, April 26, 2009

Harvest techniques in palm oil

Period quoting the results are very exciting and be expected. It's saying, what you plant, it is also that you generate. Similarly in the oil palm plantation, after waiting more than 2,5-3 years, you will receive a harvest of fresh fruit bunches (FFB). Do not wrong, there are criteria harvest, so more or less like this: harvest criteria set for the high quality oil and the quantity of oil to the maximum.
To achieve this, factors such as factors determining the optimal ripe fruit, harvest rotation, how these units, and transporting the fruit to the factory must get major attention. High-quality oil is obtained from the fruit of the womb have a fatty acid-free, it is approximately 2.5 percent. When the oil palm fruit removed from bunches, free fatty acid contents can be increased with bulge 0.9 percent per day.
The issues that caused the decreasing quality of oil is as follows (this is a theory but must be implemented with both); bunches of cut fruit is too ripe; bunches of cut fruit not ripe; the fruit there are injured or disabled, it may be because: does not the heart careful when quoting, the heart does not collect hearts while fruit, enter/ loading fruit in a rough truck, fruit harvested was not processed directly to the factory (over 24 hours), the fruit mixed with dust and soil on the place of collection results.
Meanwhile, based on experience, is generally performed in the set criteria based on the number of mature fruit harvest is separated from bunches. Separated from the fruit bunches to prove that the fruit was ripe, which means that the formation of oil in the fruit has been completed. As a general criterion, it can be said that the hand "ripe harvest," when the “berondolan” fresh look at the main plate of fruit 2 3, for a number of alleged "berondolan" (oil palm fruits that have fallen).
Harvest early in the plant that is still done by using low dodos and escalate when the plant is not possible using the dodos, bamboo spear used in complete “egrek” on knife edges. How to harvest a lot of adults applied at palm this is the system bell. This collector system on the results (harvester) is given a shelf of land that will be harvested and each collector of some of the wicket. Shelf is a shelf so that it does not stay after the crop harvest is finished ago harvester random move to the next.

Saturday, April 25, 2009

Age near forty


Today, I make a note that I think important. At the age of the 40-year, I face many challenges of life. Especially in his career, whether the monetary crisis which they say is still in progress and continue to be, or that of my age on like this .. I have many problems of his career. I work in a small company and small, with the core business-that he is also. I have led the company, but I feel satisfied I have not achieved? 

My children are great, I have feelings of fear. Afraid to imagine, if the life of this family will be better in the future?

I always pray to God, so I was given instructions. How do I manage this feeling of fear. I want free, so it does not become a burden in my mind.

Do I feel this will happen to everyone? I do not know .. I only hope that I be quiet and fortitude aga life remains better.